Airbus Illescas

Project description

Consists of connecting the north factory to the south factory through plot P1 in sector 7B of Illescas. Concrete walls were built around the perimeter of the plot, car parks P1 and P2 were constructed, a road was built to connect the factories and a metal canopy and gates were constructed to refurbish access to the factories. A pedestrian walkway between the two factories was also constructed, with a height difference of 4 metres, involving ramps and stairways. The factory was also provided with a new security system including cameras and detection systems, and a new security checkpoint and 5 pedestrian access control points were constructed.

Budget: 1.3 M Customer: Airbus Operations Company: Eiffage Infraestructuras

Duration: 28 weeks Location: Illescas (Toledo)

Project Details

Categories:

By: