Dismantling of the Aparecida – Tordesillas high voltage line

Dismantling of a 220 kV high voltage overhead line from section T2 to T5 between the towns of Aparecida and Tordesillas.

Main features:

  • Line length: 150 km.
  • Line type: simple circuit, Duplex.
  • Cable: Grosbeak.

Budget: €5 million Customer: Red Eléctrica de España Company: Eiffage Energía

Duration: 2013 Location: Valladolid (Spain)

Project Details

By: