Medium voltage, low voltage and special electrical installations.

Main features:

  • Total power: 30,730 KVA .
  • Bread lines. 2×2000 KVA with 5 production lines.
  • Cold building: 3×2500 KVA + 2×2500 KVA, for frozen products, refrigerated products +3ºC/12ºC and fish.
  • Packages building.- 1×1600 KVA.
  • Dry goods building: 2×2500 KVA + 2×2500 KVA and 1×1600 KVA.
  • Services building: 400 KVA including the office, cafeteria and nursery blocks.
  • Communal areas: 630 KVA consisting of the 2 MV rings from the substation to the different transformer stations; pump building for the fire extinguisher installation, drinking water and irrigation, and the block’s outdoor lighting.
  • Total constructed area: 120.000 m².

Budget: €15 million Customer: Mercadona Company: Inelbo (Eiffage Energía)

Duration: 2011 – 2016 Location: Abrera, Barcelona (Spain)