Construction (EPC) of infrastructure for the electricity evacuation line at the Mula solar photovoltaic plant (Murcia), one of the largest in Europe, with a capacity of 493 MW and a surface area of almost 1000 hectares. The plant will produce over 750 million kWh per year, which is enough energy to supply a city of the size of Murcia, the regional capital.
Budget: € 9 M
Customer: Cobra
Company: Eiffage Energía
Duration: 7 months (2018-2019)