Electrical Infrastructure for the Extremeña Talasol Solar Farm

The scope of the project includes engineering, procurement and construction (EPC), as well as auxiliary facilities to inject energy into the grid. It also has a 400 kV substation; a 24 km-long high voltage line for interconnection with the grid; and a 2-year operation and maintenance (O&M) services contract.

Customer: METKA Company: Eiffage Energía

Duration: 2020 Location: Talaván, Cáceres (Spain)

Project Details