Huatacondo Solar Plant

2020-07-29T21:21:40+02:00

Project description The 103 MW Huatacondo photovoltaic plant has 365,000 solar panels on 150 hectares, equivalent to 180 football pitches, and 72,000 separate foundations. The plant plans to generate production of 275,000 GW/h of clean energy, which will supply over 70,000 people, and will avoid the emission [...]

Surface refurbishment and local structural work on the road surface of the N-432 highway between Llenera and Azuaga

2020-07-29T21:24:47+02:00

Project description Surface refurbishment of the stretch of highway N-432 between Llerena and Azuaga, of the entire road surface including hard shoulders, between km markers 113+000 and 145+000, province of Badajoz. 224,000 m2 of cold-in-place recycling with a surface cross-section of 12 cm of emulsion. In-place recycling [...]

Parc Científic, Barcelona

2020-10-15T13:31:57+02:00

Sub-phase II facilities infrastructure Laboratory building and service building at Parc Científic, Barcelona. Main features: Turnkey project. Surface area: 45,300 m2. Collaboration with the project design. Eiffage Energía has launched several energy efficiency studies. MV/LV electricity. Fluids (air conditioning, plumbing, natural gas, laboratory gases). Steam installation. Weak signals (fire, protection, [...]

Several actions on Iberdrola’s distribution network

2020-10-15T13:31:57+02:00

Framework contracts for the maintenance of distribution networks in the provinces of: Albacete, Cuenca, Madrid, Guadalajara, Castellon, Alicante and Murcia. Main features: Cut-off and metering framework contracts in the provinces of: Navarra, Burgos, Soria, Caceres, Valencia and Murcia. Including the following services: LV supply cut-off and reinstatement; Usual metering; Special metering; [...]

Go to Top